Davi numbers in Wind Energy

4 Infeed conveyor solutions
300+ Wind energy rolling lines installed worldwide
200+ Players rolling wind energy solutions with Davi
Infeed conveyor
To intensively produce cylindrical cans and cones. The plate can be loaded on conveyor in any position and the manipulator system automatically operates the plate positioning and alignment. In case of cone forming, the plate rotation is made continuously and automatically.
Self-aligning overhead support
with adjustable holding position for cones. Holding point adjustment to have an efficient load distribution based on different diameter and cone angle
Pushers with hooking fingers
Strengthened and enlarged pushers will contribute to the initial plate positioning, provide plate rotation during cone forming, and allow for perfect alignment of the two edges for tack-welding

Monopiles

Monopiles are foundation structures that typically have a diameter ranging from 7 to 15 metres (23’ to 50’); they are made of steel, using plate up to 4 or 4,5 metres (13’ or 15’) width and thicknesses varying between 50 and 170 millimetres (2" to 7"). Monopiles sections are cylindrical and conical in shape. Their maximum length can reach between 80 and 120 metres (262’ and 394’); they weigh between 3,000 and 4,000 tons. Monopiles are designed to be driven into the seabed and provide support for wind turbine towers. They are used in water depths ranging from 50 to 60 metres (164’ to 196’). The angle of conicity, which is the tapering of the conical part of the structure, varies between 10 and 16 degrees.

Transition Pieces

Transition pieces serve as a crucial connection between the monopile foundation and the wind turbine tower. They have a diameter that typically falls in the range of 6 to 12 metres (20’ to 40’), with a maximum thickness of 150 to 170 millimetres (6" to 7"). Transition pieces are designed to accommodate the transition from the wider monopile to the narrower tower. They are made of plate up to 4 or 4.5 metres (13’ to 15’) wide; in general they are cylindrical with flanges but sometimes conical with an angular configuration of 10 to 12 degrees. The maximum length of a transition piece is about 32 metres (105’), and they typically weigh between 1,500 and 2,000 tons. These pieces play a vital role in ensuring the stability and integrity of the entire offshore wind turbine structure.

Tripods

Tripods are specialized foundation structures used particularly in water depths ranging from 45 to 50 meters (148’ to 164’). They have a unique three-legged design, which is why they are called tripods. The diameter of each leg can vary from 3 to 10 meters (10’ to 33’), and the steel thickness can be as thick as 120 millimeters (5”). The width of the tripod's steel plates is typically 4 to 4.5 meters (13’ to 15’), and they can weigh up to 4,000 tons. Tripods are designed to provide stable support for wind turbines in deeper waters. Their triangular configuration helps distribute the load evenly and secure the turbine tower in place. Tripods are an innovative solution for harnessing wind energy in challenging offshore environments.

DAVI SOLUTIONS FOR MONOPILE FOUNDATIONS

When it comes to the construction of robust and reliable monopile foundations for offshore wind turbines, Davi offers a comprehensive suite of cutting-edge solutions that set the industry standard.

Feeding Systems

Linear

Ideal to intensively produce cylindrical cans. In case of cones, the plate must be partially supported by cranes.

Modular

To intensively produce cylindrical cans. Cones are also possible with repetitive plate adjustments. The plate must be loaded and positioned by cranes; only a fine tuning alignment is possible with pushers. In case of cone forming, the intermittent and time consuming plate rotation is made through pushers.

Extended

To intensively produce cylindrical cans and cones. The plate can be loaded on conveyor in any position and the manipulator system automatically operates the plate positioning and alignment. In case of cone forming, the plate rotation is made continuously and automatically with the SMART LINE feeding system; or intermittently with time consuming repositioning through pushers.

Adaptive

To intensively produce cylindrical cans and cones. The plate must be loaded and positioned by cranes; only a fine tuning alignment is possible with pushers. In case of cone forming, the plate rotation is made continuously and automatically with the SMART LINE feeding system; or intermittently with time consuming repositioning through pushers.

Jacket Foundations

Transition Piece (TP)

At the top of the jacket foundation, you'll find the Transition Piece (TP), which acts as the connection point between the structure and the tower. With diameters ranging from 6 to 10 meters (20’ to 33’) and thicknesses of up to 100-120 millimeters (4”-5”), the TP plays a critical role in anchoring the entire tower securely.

Legs

The sturdy legs of a jacket foundation are the primary load-bearing components. These robust structural elements come in diameters ranging from 1000 to 2500 millimeters (40” to 100”), with thicknesses varying from 50 to 120 millimeters (2” to 5”). The legs provide the necessary strength and stability to support the weight of the offshore structure.

Braces

Braces serve as diagonal supports within the jacket foundation structure. With diameters ranging from 600 to 1200 millimeters (24” to 48”) and thicknesses of 35 to 40 millimeters (1”3/8 to 1”5/8), they play a crucial role in distributing loads evenly across the entire assembly. This ensures that the foundation can withstand the dynamic forces of the marine environment.

Pin Piles

The pin piles are integral components that penetrate the seabed, anchoring the jacket foundation firmly in place. Usually these piles come in diametres ranging from 1.5 to 2 metres (5’ to 6’), with thicknesses typically ranging from 40 to 80 millimetres (1”5/8 to 3”3/16); however, in earthquake prone areas, the diametres can go up to 3,5/4m (12’/13’). The pin piles provide the necessary stability to withstand the forces of waves and currents.

DAVI SOLUTIONS FOR JACKET FOUNDATIONS

RE-ROLLING

Re-rolling can be done with both the 3-roll (preferred solution) or the 4-roll. The 3-roll MAV is more flexible as it can adapt its geometry based on the thickness of the sheet to be calibrated. It can also tilt all three rolls, allowing for precise alignment of the point of tangency between the rolls and the shell along the generatrices of the cone. The re-rolling process is particularly used for foundations.

ANY QUESTIONS?
get in touch with us and we'll overcome your challenges together
Davi's sales and technical team is adept at providing comprehensive assistance to every client, catering to their specific requests with utmost expertise and proficiency.

MEDIA

Plate Roll - MCB (4 rolls) - Machine for the Food Industry
Videos
Plate Roll - MCB (4 rolls) - Machine for the Food Industry

Titan Wind Energy’s strategic investment for offshore projects
Success stories
Titan Wind Energy’s strategic investment for offshore projects

Titan Wind Energy announces a significant investment in manufacturing equipment. The company has recently purchased four heavy-duty plate rolls,...

Corporate - Davi, Inc. - Davi staff and the dealers at Fabtech 2024
Videos
Corporate - Davi, Inc. - Davi staff and the dealers at Fabtech 2024

IDESA selects Davi for plate rolling technology - as read on offshoreWIND
ARTICLES AND NEWS RELEASES
IDESA selects Davi for plate rolling technology - as read on offshoreWIND

Davi announces that a giant MCB 4-roll plate roll has recently been installed at IDESA , an international provider of equipment for the pe...

Corporate - Davi, Inc. - Fabtech 2024
Videos
Corporate - Davi, Inc. - Fabtech 2024

Shop Shapes Tank Industry with Advanced Plate Rolling Technology
Success stories
Shop Shapes Tank Industry with Advanced Plate Rolling Technology

AlumiTank stands out as a unique fabrication shop capable of producing both pressurized and non-pressurized cylindrical tanks, as well as various non...

Davi Global Wind Energy Seminar 2024
Shows and events
Davi Global Wind Energy Seminar 2024

Davi's Global Wind Energy Seminar 2024: a successful gathering of industry leaders Cesena, Italy – Davi announces the success of its Global ...

Davi Plate Rolls achieve official acceptance at Sif’s facility in Maasvlakte Rotterdam Project Updates - as read on offshoreWIND
ARTICLES AND NEWS RELEASES
Davi Plate Rolls achieve official acceptance at Sif’s facility in Maasvlakte Rotterdam Project Updates - as read on offshoreWIND

A new milestone was marked in the collaboration between the two industry-leaders, as the Davi Plate Rolls have been officially accepted by ...

Corporate - Davi HQ - Global Wind Energy Seminar 2024
Videos
Corporate - Davi HQ - Global Wind Energy Seminar 2024

Plate Roll - MCA (4 rolls) - Tanks - @ AlumiTank
Videos
Plate Roll - MCA (4 rolls) - Tanks - @ AlumiTank

Request for quote Immediate delivery

Follow our newsletter

Subscribing to our newsletter you accept our Privacy Policy